What it costs

Prices, and the list of what is not in them.

Fourteen of the eighteen loft conversion websites we looked at before building this one showed no price at all. Here is ours, by type, with a worked breakdown and an exclusions list you can hold against a competitor's quote.

TypeGuide rangeTypicalOn site
RooflightLofts that already have the height. The cheapest honest answer. £22,500–£30,000 £27,500 6–9 weeks
Rear dormerThe standard Victorian or 1930s terrace and semi. The workhorse. £40,000–£60,000 £50,000 8–12 weeks
Hip to gableEnd-of-terrace and semis with a hipped, sloping side roof. £50,000–£70,000 £60,000 10–14 weeks
L-shaped dormerVictorian terraces with a rear outrigger — the back addition. £45,000–£80,000 £62,000 12–16 weeks
MansardWhere you need maximum volume, or the conservation officer insists. £50,000–£80,000 £65,000 14–20+ weeks

Guide ranges for Surrey, England. Sources: Checkatrade cost guide (updated March 2026) and the HomeOwners Alliance (updated July 2026), which agree closely. Prices vary by region — city centres typically run higher than the surrounding area. Every one of these is confirmed in writing after a survey — none of them is a quotation.

Conversion types explained

Rooflight

No change to the roof shape at all — a new floor, a staircase, insulation, and rooflights set into the existing slope. If your ridge height works without alteration, anyone selling you a dormer is selling you a dormer.

Planning: Almost always permitted development, and — unusually — this is the one type that generally survives in a conservation area.

Rear dormer

A flat-roofed box built out from the rear roof slope, converting a triangle of unusable space into a full-height room. This is the type that turns a marginal ridge height into a usable bedroom with an en-suite.

Planning: Usually permitted development within the volume allowance — 40m³ terraced, 50m³ semi and detached.

Hip to gable

The sloping side of the roof is built up vertically into a flat gable wall, squaring off the space. Usually paired with a rear dormer, which is where most of the extra floor area actually comes from.

Planning: Permitted development in most cases — the eaves set-back rule is expressly waived for a hip-to-gable enlargement.

Mansard

The rear roof is rebuilt at roughly 72° with a near-flat top, producing the most floor area of any conversion. Effectively a new storey, and priced accordingly.

Planning: Almost always needs full planning permission. Frequently the only form a conservation area will accept.
Your number

Estimate your own price

Pick your conversion type and whether you want an en-suite — this uses the same real trade costs as the worked example below, just applied to your job instead.

Estimated total, ex. VAT
£54,200£62,300
Structure & roof£28,200
Staircase & floor£7,600
First & second fix£9,800
En-suite bathroom£8,700
Ranges reflect real jobs built this year. A written fixed price follows a free site survey, usually booked within a week.
Worked example

30m² rear dormer, Surrey, mid specification, one en-suite

£50,000£1,667 per m² · 30m² added
  • Roof coverings£8,250Tiles, lead, felt, guttering, and making good the existing roof
  • Internal preparation£7,000Strip out, chimney work, moving tanks and services
  • Structural steel£6,000Beams, padstones, and the calculations behind them
  • Roof structure alterations£5,000Cutting the opening, new rafters, dormer framing
  • Scaffolding£4,750Erection, weekly hire for the full programme, and a highway licence
  • Joinery£4,500Doors, skirting, architrave, eaves storage — excluding the staircase
  • Project management£4,000Programming, building control liaison, site supervision
  • Electrics and plumbing£3,250First and second fix, interlinked alarms, en-suite services
  • Staircase£2,750Manufacture and fit, plus landing alterations
  • Plastering£2,750Boarding, skim, and the fire-rated linings
  • Decoration£1,750Mist coat and two finish coats throughout

The build cost is not the project cost.

Build cost, as quoted£50,000
Fees and extras — design, calculations, planning, building control, party wall+10–15%
Contingency, because something is always behind the plaster+10–15%
What it actually costs you£60,000–£65,000

Figures are indicative for England and dated to their sources — Checkatrade's cost guide (updated March 2026) and the HomeOwners Alliance (updated July 2026), which agree closely. London and the South East typically run 25–35% above these. A quotation is what you get after a survey; this is what you get before one.

The scope schedule

What is in, what is out, and how a change gets priced.

Not one of the eighteen sites we audited publishes this. It is the single reason homeowners cannot compare three quotes, and it is the source of nearly every mid-build argument in this trade.

Included as standard
  • Full structural design and calculations by a chartered engineer
  • Building control application, inspections and the completion certificate
  • Party wall notices drafted and served on every adjoining owner
  • Scaffolding, skips, highway licences and all site protection
  • Interlinked mains-powered smoke alarms to every level
  • FD30 fire doors and the protected stairway upgrade
  • Insulation to current Part L, and a summer overheating strategy
  • Plastered, decorated and ready to furnish
  • Daily clean-down and a final professional clean
Not included — and what it usually costs
  • Planning application fee, where one is needed£548
  • Lawful development certificate£274
  • Party wall surveyor fees, if a neighbour dissents£900–£1,500
  • Sanitaryware, tiling and brassware for the en-suite£2,500–£8,000
  • Floor coverings£1,200–£4,000
  • Fitted wardrobes and bespoke joinery£3,000–£9,000
  • Relocating the staircase£4,000–£11,000
  • Sprinkler system, where ground floor is open-planQuoted at survey
  • Bat survey, where the roof shows evidence£400–£750
Variations: Anything not on the included list is a variation. Variations are priced before they are carried out, in writing, at day rate plus materials at cost plus 12% — and you sign them off before we start. Nothing appears on a final invoice that you have not already agreed.

Get the number for your house.

A survey takes ninety minutes and costs nothing. You get a feasibility answer that day and a written scope schedule within the week.