Pay part of the deposit by credit card
Section 75 of the Consumer Credit Act makes the card provider jointly liable with us for the whole contract value, on anything between £100 and £30,000. We will actively encourage you to do it.
The trade quotes six to eight weeks and takes ten to fourteen, and the overrun always lands in snagging — which is exactly where the relationship breaks down. We would rather show you the hard weeks now.
Measured survey, feasibility, drawings, structural calculations.
Living with it: Two visits, both under two hours. Nothing changes in your house.
Planning or lawful development certificate, building control, party wall notices.
Living with it: The two-month party wall notice runs here — the stage everyone underestimates.
Scaffold up, roof opened, old structure removed.
Living with it: Genuinely easy — everything happens outside and above you.
Structural beams craned in, new floor joists, deck laid.
Living with it: The noisiest fortnight of the whole job. Drilling into masonry directly over your bedroom ceiling.
Dormer framed, roofed, leaded and glazed. The building is closed again.
Living with it: Quieter, and the first week the thing looks like a room from the garden.
Landing opened up, staircase manufactured and fitted.
Living with it: The hard week. Your house is now open to the loft and dust reaches rooms you did not expect. Lasts about five working days.
Electrics, plumbing, insulation, fire linings, boarding and skim.
Living with it: Dusty rather than loud. Plastering weeks are wet — the house feels cold for a few days while it dries.
En-suite fitted, doors hung, joinery, decoration.
Living with it: Back to normal noise. This is the week it starts being enjoyable.
Final building control inspection, snagging list, completion certificate, handover folder.
Living with it: The stage where the rest of the trade disappears. We book it as a fixed week with named people on site.
A large deposit is the clearest warning sign in this trade. Citizens Advice say never agree more than 25%. We cap ours at 15% and take everything else against completed stages you have walked on.
Capped at 15%. Citizens Advice advise never agreeing more than 25%, and we think even that is high.
Paid after the stage is complete and you have walked on it. Never before.
Dormer roofed, leaded and glazed. The building is closed.
First fix signed off by building control, walls and ceilings finished.
Everything finished and working, snagging list agreed.
Released when building control issues the completion certificate. Held for up to eight weeks.
Section 75 of the Consumer Credit Act makes the card provider jointly liable with us for the whole contract value, on anything between £100 and £30,000. We will actively encourage you to do it.
A separate policy from an insurer that responds if we cease to trade. You get the certificate with your name on it, not a badge on a website.
Public liability, employer's liability, professional indemnity, and contractors' all-risk covering the works while they are half-built.
Start date, finish date, working hours, who supplies what, and the payment schedule above. Fourteen-day cooling-off, because we sign it at your kitchen table.
Ninety minutes, no cost, no obligation, and an honest answer on the day.